Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 27 results ...

Arora, R (1997) Role and influence of emerging social dynamics in decisions on investment opportunities in construction industry, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Bhattacharya, S (2011) Enablers of growth for construction companies in India: a strategic approach, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Deshpande, S D (1988) Some facility planning techniques for construction site layouts, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Jayesh, M P (2020) Inter-state migration for employment in India: a study on construction workers in Kerala, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Jha, K N (2004) Factors for the success of a construction project: empirical study, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Johari, S (2021) Effect of socioemotional cognitive, and technical competencies of workers on construction labor productivity, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kar, S (2021) Developing a decision support system for effective material management in construction, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Karimi, Z (2016) Construction project performance metrics: conceptualization, measurement and application in metro rail, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kuldip, C (1989) OR applications in strategic sector constructions with capital budgeting, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kulshrestha, M (1997) Total Value Control in Construction through Multiple Criteria Decision Making (MCDM), Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kumar, R (2020) Risk management framework for construction projects aligned to actualities, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kumar, S V (2019) Identification and modelling of risk factors, mitigation measures, and entry strategies for Indian construction firms in international markets, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kumar, V S S (1993) Application of fuzzy set theory in construction management, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Maddah, R (2019) An analysis of risks faced by foreign construction firms in India and their effect on project performance, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Mathur, R N (1986) Perception of quality of working life and the related factors: a study of women workers in construction industry, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

  • Type: Thesis
  • Keywords: education; security; construction site; women; migration; construction worker; interview
  • ISBN/ISSN:
  • URL: http://eprint.iitd.ac.in/handle/12345678/5697
  • Abstract:
    The present investigation was planned to study quality of working life (QWL) among women workers in the unorganised construction industry and an attempt was made to relate QWL with background variables, work-related variables, general awareness, attitude towards education, performance level and need fulfilment. The measuring instruments for the aforesaid variables were either developed or modified versions were adopted, based on informal interviews with women workers. 220 women construction workers were selected randomly from 22 different construction sites in five zones of Delhi for face-to-face interview. The performance level was assessed by 22 immediate supervisors. Appropriate uni-, bi- and multi-variate statistical techniques were used for data analysis. Looking to the paucity of data and relevant research evidences, seven null hypotheses were framed for all the variables under investigation, Hypothesis I which stated no relation existed between background variables with QWL, was largely accepted as none of the variables predicted QWL, however, migration category, educational status and per-capita family income were found related to QWL. Hypothesis II stated that no relationship existed between work-related variables and QWL, was also accepted as only one variable i.e. willingness to become skilled worker, was found to predict QWL. However, this variable and cooperation from co-workers were found related to QWL. Hypothesis III, which stated that no relationship existed between QWL and living conditions variables, was accepted as none of the variables were either predictive or related to QWL, Hypothesis IV stated that general awareness was not related to QWL was accepted as it was neither found predictive nor related to QWL. However, high and low QWL groups significantly differed each other. Hypothesis V indicated that attitude towards education was not related to QWL, was found true. Attitude towards education was neither predictive or related to QWL. The high and low QWL groups did not differ significantly. Hypothesis VI stated no relationship of QWL with performance level dimensions was rejected as all the fourteen variables were found significantly related and physical strength, perfection in work, understand the job and overcoming problems independently were found as predictor variables of QWL. Hypothesis VII stated that need fulfilment was not related to QWL, was also reject ed as all the five needs, i.e, basic security, belonging, esteem and self-actualization needs were significantly related to QWL, first four needs were also found predictive of QWL. On the basis of the findings, implications of the study were discussed and further suggestions for research made.

Mujumdar, P (2017) Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Patel, D A (2015) Estimating the number of fatal accidents and investigating the determinants of safety performance in indian construction, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Sharma, R (1998) Organizational role stress:focus on executives of construction industry, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Tripathi, K K (2018) Critical success factors for construction organizations in India, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.